Ero sivun ”TODO” versioiden välillä
Siirry navigaatioon
Siirry hakuun
(→DONE) |
|||
Rivi 83: | Rivi 83: | ||
'''A list of '''completed''' 'projects involving the machines or structures of the lab.''' | '''A list of '''completed''' 'projects involving the machines or structures of the lab.''' | ||
− | * <del> Saw logs for woodworking, according to Wandel model at least two at the height of the circular saw table and two at the height of the cutting saw | + | * <del> Saw logs for woodworking, according to Wandel model at least two at the height of the circular saw table and two at the height of the cutting saw </del> |
* <del> Print mode electricity </del> | * <del> Print mode electricity </del> | ||
* <del> Transfer routers and other hardware from a large rack to a small black rack on the wall; more information from the government </del> | * <del> Transfer routers and other hardware from a large rack to a small black rack on the wall; more information from the government </del> | ||
* <del> Wood workspace; warm air knife for carpenter; more information from the government </del> | * <del> Wood workspace; warm air knife for carpenter; more information from the government </del> | ||
* <del> Door pump for fire workspace door </del> | * <del> Door pump for fire workspace door </del> | ||
− | * Minifactory install rasp Cura, put profiles and settings in order, document; more information Rambo @slack | + | * <del> Minifactory install rasp Cura, put profiles and settings in order, document; more information Rambo @slack </del> |
− | * [[Ultimaker]] unpack-clean-pile-calibrate; more info thjt @slack | + | * <del> [[Ultimaker]] unpack-clean-pile-calibrate; more info thjt @slack </del> |
− | * Wood workspace shelf gym | + | * <del> Wood workspace shelf gym </del> |
− | ** More space is required for the plastic fuse board for a larger box | + | ** <del> More space is required for the plastic fuse board for a larger box </del> |
− | ** Move the 80cm shelf spacing from the left edge of the shelf to the right side of the electrical panels | + | ** <del> Move the 80cm shelf spacing from the left edge of the shelf to the right side of the electrical panels </del> |
− | ** Move the end of the shelf from the centers on the left 20cm to the right | + | ** <del> Move the end of the shelf from the centers on the left 20cm to the right </del> |
− | ** Assemble a new 100cm shelf spacing at the left end of the shelf | + | ** <del> Assemble a new 100cm shelf spacing at the left end of the shelf </del> |
− | * a better solution for cardboard collection | + | * <del> a better solution for cardboard collection </del> |
− | * Labeling new waste containers and writing instructions | + | * <del> Labeling new waste containers and writing instructions </del> |
* For electricians | * For electricians | ||
− | ** Wood room air purifier; the cruise control off and replaced with the clutch cable connected to the machine | + | ** <del> Wood room air purifier; the cruise control off and replaced with the clutch cable connected to the machine </del> |
− | ** Replacement of the "new" column drill operating switch | + | ** <del> Replacement of the "new" column drill operating switch </del> |
Rivi 106: | Rivi 106: | ||
|- | |- | ||
| | | | ||
+ | |||
== SUUNNITELMAT == | == SUUNNITELMAT == | ||
Versio 30. tammikuuta 2021 kello 07.38
Left column Finnish! |
Right column English |
|
KeskeneräinenTälle sivulle on kerätty listaa keskeneräisistä läbin koneisiin tai rakenteisiin liittyvistä projekteista.
|
IncompleteA list of incomplete projects involving the machines or structures of the lab.
| |
EI KIIRETTÄ
VALMIINA ALOITTAMAAN
|
Not in a big hurry
Be prepared
| |
VALMISA list of completed projects involving the machines or structures of the lab.
|
DONEA list of completed 'projects involving the machines or structures of the lab.
| |
SUUNNITELMATRemontti, loppuvuosi 2017 Tämän pohjalta lähdetään:
|
PLANS'Renovation, rest of 2017' Based on this, we start:
|