Kohteesta Helsinki Hacklabin wiki
|
|
Rivi 70: |
Rivi 70: |
| ==February== | | ==February== |
| | | |
− | * 6 New Ultrasonic washer ready | + | * 6 A new ultrasonic washer is completed |
| * 7 Hallway electricity was improved | | * 7 Hallway electricity was improved |
− | * 19 Electronics wall cabinet component list was updated | + | * 16 There was a technical problem with the laser cutter |
| + | * 19 Component list for Electronics trays was updated |
| + | * 20 Received chemicals as a donation |
| + | * 21 A new chemical cabinet was installed in the 3D printer room |
| + | * 21 Electronic components were received from The Yleis Elektroniikka as a donation |
| + | * 28 Motion lights were examined |
| + | * 28 Lotta's presses are serviced |
| | | |
| ==March== | | ==March== |
Versio 1. maaliskuuta 2021 kello 22.32
Saaga 2021!
tammikuu
- runsasti lumitöitä
- imukaappi on käytössä
- wiki sivustojen päivitys jatkuu
- 10 Uuden sorvin kunnostus alkaa
- 13 pihaa siivottiin lumitöitä varten
- 18 Ultraäänipesurin kunnostus alkoi
- 22 Katolta valuva jää rikkoi imukaapin piipun
- 23 Elektroniikkahuoneeseen lisättiin 8 uutta komponentti lokerikkoa
helmikuu
- 6 Uusi ultraäänipesuri valmistuu
- 7 Eteisen sähköjä paranneltiin
- 16 Laserleikkurissa oli tekninen ongelma
- 19 Elektroniikan lokerikkojen komponenttiluettelo päivitettiin
- 20 Saatiin kemikaaleja lahjoituksena
- 21 Uusi kemikaalikaappi asennettiin 3D-printteri huoneeseen
- 21 Saatiin elektronisia komponentteja yleiselektroniikalta lahjoituksena
- 28 Liikevalot tutkittiin
- 28 Lotan puristimet on huollossa
maaliskuu
- Uusi metallisorvi edistyy
- Lotan PC on yritetty murtautua
- 1 Liikevalot ovat kunnossa
huhtikuu
toukokuu
kesäkuu
heinäkuu
elokuu
syyskuu
lokakuu
marraskuu
joulukuu
|
Saga 2021!
January
- lots of snow removal
- fume hood is in use
- wiki sites update continues
- 10 Renovation of a new lathe begins
- 13 yard was cleaning from junks for snowstorm
- 18 Renovation of the ultrasonic washer began
- 22 Running ice from the roof broke the chimney of the fume hood
- 23 Eight new component bins were added to the electronics room
February
- 6 A new ultrasonic washer is completed
- 7 Hallway electricity was improved
- 16 There was a technical problem with the laser cutter
- 19 Component list for Electronics trays was updated
- 20 Received chemicals as a donation
- 21 A new chemical cabinet was installed in the 3D printer room
- 21 Electronic components were received from The Yleis Elektroniikka as a donation
- 28 Motion lights were examined
- 28 Lotta's presses are serviced
March
April
May
June
July
August
September
October
November
December
|