Ero sivun ”Metallitilan Nakkilista/en” versioiden välillä

Helsinki Hacklabin wikistä
Siirry navigaatioon Siirry hakuun
(Ak: Uusi sivu: === Sorting of the Material Storage ===)
(Ak: Uusi sivu: * ☑ Move small pieces into separate boxes * ☐ Sort and arrange the pile of metal next to the garage door. Move the extra material into the shipping container. * ☐ Design a ma...)
Rivi 17: Rivi 17:
 
=== Sorting of the Material Storage ===
 
=== Sorting of the Material Storage ===
  
* ☑ Pienen silpun lajittelu laatikoihin
+
* ☑ Move small pieces into separate boxes
* ☐ Nosto-oven vieressä olevan kasan lajittelu ja järjestäminen. Ylimääräisen materiaalin vienti konttiin.
+
* ☐ Sort and arrange the pile of metal next to the garage door. Move the extra material into the shipping container.
* ☐ Materiaalihyllyn suunnittelu.
+
* ☐ Design a material rack.
* ☐ Materiaalihyllyn rakentaminen.
+
* ☐ Build the material rack.
* ☐ Materiaalin siirtäminen uuteen hyllyyn.
+
* ☐ Move materials into the material rack.
  
  

Versio 18. toukokuuta 2023 kello 15.00

Muut kielet:

== Open Tasks ??


Drill Press

  • ☑ Choose Location. Preliminary location is in the corner next to the door between the woodworking and metalworking rooms.
  • ☐ Empty the chosen location. Currently contains parts from the lathe. Move parts next to the lathe and arrange into the cabinets.
  • ☐ Acquire a table. Depth max. 70cm, width about 200cm. (TODO: check the width)
  • ☐ Buy the drill. Possibly Bosch PBD 40.
  • ☐ Buy drill bits. The drill should have its own set of bits that are attached to the drill press.
  • ☐ Attach the drill to the table.
  • ☐ Make a drill bit holder for the drill bits. Attach it to the drill press. The idea is that the drill bits are only used with the drill press which allows us to track how long they'll last.


Sorting of the Material Storage

  • ☑ Move small pieces into separate boxes
  • ☐ Sort and arrange the pile of metal next to the garage door. Move the extra material into the shipping container.
  • ☐ Design a material rack.
  • ☐ Build the material rack.
  • ☐ Move materials into the material rack.


Lotan takana olevan tilan siistiminen

  • ☐ Sammuttimien tarkistus, lajittelu ja siirto muualle. Säilytys jossain muualla kuin metallitilassa esim. konttissa.


Appendix

Checked and unchecked checkboxes for copy-pasting: ☑☐