Rivi 19: Rivi 19:
 
pending..
 
pending..
 
* printer, maybe vinyl cutter and other graphics work equipment (A)
 
* printer, maybe vinyl cutter and other graphics work equipment (A)
 +
 +
 +
TODO:
 +
* The "foot trap" in the A-space should be dismantled from flor.
 +
* Electrical sticking wires in kitchen should be removed.
 +
* The location of surface mount electric sockets should be looked at
 +
* The refrigerator should be moved under the network cabinet
 +
* RFID key reader must to install and connect the door electric lock
  
 
[[Luokka:Tilat]]
 
[[Luokka:Tilat]]

Versio 17. tammikuuta 2021 kello 00.11

Yläkerta0001.png

All information on this page is subject to change and update as the upstairs workroom expansion project continues.

Upstairs floor plan with some measurements


  • Rooms B, C, D are sublease
  • Room A, kitchen, toilets and sauna are in use

The upstairs workrooms might have in near future for example:

  • amateur radio room amateur radio room(C)
  • sewing and textile room sewing and textile room (A)
  • work desks for quiet work (A)
  • Order about 100 smart stores on Lundia shelves.
  • The lights are working but works by plugging in (so far because the power is under construction)
  • Fridge, kettle and microwave works


pending..

  • printer, maybe vinyl cutter and other graphics work equipment (A)


TODO:

  • The "foot trap" in the A-space should be dismantled from flor.
  • Electrical sticking wires in kitchen should be removed.
  • The location of surface mount electric sockets should be looked at
  • The refrigerator should be moved under the network cabinet
  • RFID key reader must to install and connect the door electric lock