Rivi 19: | Rivi 19: | ||
pending.. | pending.. | ||
* printer, maybe vinyl cutter and other graphics work equipment (A) | * printer, maybe vinyl cutter and other graphics work equipment (A) | ||
TODO: | |||
* The "foot trap" in the A-space should be dismantled from flor. | |||
* Electrical sticking wires in kitchen should be removed. | |||
* The location of surface mount electric sockets should be looked at | |||
* The refrigerator should be moved under the network cabinet | |||
* RFID key reader must to install and connect the door electric lock | |||
[[Luokka:Tilat]] | [[Luokka:Tilat]] |
Versio 16. tammikuuta 2021 kello 22.11
All information on this page is subject to change and update as the upstairs workroom expansion project continues.
- Rooms B, C, D are sublease
- Room A, kitchen, toilets and sauna are in use
The upstairs workrooms might have in near future for example:
- amateur radio room amateur radio room(C)
- sewing and textile room sewing and textile room (A)
- work desks for quiet work (A)
- Order about 100 smart stores on Lundia shelves.
- The lights are working but works by plugging in (so far because the power is under construction)
- Fridge, kettle and microwave works
pending..
- printer, maybe vinyl cutter and other graphics work equipment (A)
TODO:
- The "foot trap" in the A-space should be dismantled from flor.
- Electrical sticking wires in kitchen should be removed.
- The location of surface mount electric sockets should be looked at
- The refrigerator should be moved under the network cabinet
- RFID key reader must to install and connect the door electric lock